T&S Construction Co., Inc.
T&S Construction Co., Inc.
  • Home
  • About Us
    • Meet the Team
    • History
    • Tom's Equipment
    • Careers
  • Projects
  • More
    • Home
    • About Us
      • Meet the Team
      • History
      • Tom's Equipment
      • Careers
    • Projects
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
    • Meet the Team
    • History
    • Tom's Equipment
    • Careers
  • Projects

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

Clarifying Tank

    Job Specs

    Location: South Lake Tahoe

    Contractor: T&S Construction Company


    This clarifying tank was a mass concrete pour, and in this case, that means the cement pour on this was about 8.5 feet deep! With that deep of a pour, our crew had to monitor the temperature of the reaction to ensure proper curing. For this job we used bluetooth temperature sensors, batched the mix with ice instead of water, poured in the cooler night temperatures, and ran cooling pipes throughout to circulate cold water. All of this helped us ensure the concrete set to specs and would stand the test of time. After all that monitoring, we also sent cores out to a lab to check for micro fractions. Once we received the all clear, the cooling lines were filled with fluid cement to increase stability of the pour and our crew was off to the next step. 


    Copyright © 2026 T&S Construction Co., Inc. and Toms Equipment Rental - All Rights Reserved.

    CA Lic. #301528 - NV Lic. #0063858

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept